Build

Bathroom Renovation Price Guide in Biot (Côte d'Azur) 2026

Bathroom renovation costs in Biot vary widely depending on the scope of plumbing work, quality of fixtures, and whether walls or floors need structural changes. Labor rates on the French Riviera run slightly higher than the national average due to demand and cost of living. Full gut renovations with waterproofing and premium finishes sit at the top of the range, while simple fixture swaps are more affordable.

1
2
3

What needs to be done?

Choose the type of work — it helps us select the right craftsmen.

Free• No obligations• ~3 minutes
WorkUnitMin €Max €
Full bathroom renovation (plumbing, tiling, fixtures)m²9502 200
Shower installation (walk-in, with waterproofing)unité1 8004 500
Bathtub installation or replacementunité9002 800
Toilet (WC) installation or replacementunité350900
Washbasin and vanity unit installationunité4501 600
Plumbing rough-in (water supply and drainage rerouting)ml80180
Waterproofing membrane (floor and walls)m²4590
Plumber hourly rate for minor repairsheure5595

Indicative estimate, not a binding offer. Exact quote after a visit.

Cost calculator

Rough estimate:
47 500 – 110 000 €

Estimate excludes major structural changes, asbestos removal, and high-end custom fixtures; final quote depends on site inspection.

What affects the price

  • Scope of work: cosmetic update versus full gut renovation with layout changes
  • Quality and brand of fixtures (standard, mid-range, or luxury)
  • Accessibility of existing pipework and need for rerouting
  • Tiling complexity, including mosaic or large-format tiles
  • Building age and condition, especially in older Nice apartments
  • Timing and contractor availability during peak tourist season

→ Bathroom plumbing

FAQ

A full renovation typically costs between 950 and 2200 EUR per m², depending on fixture quality and plumbing complexity.

Basic demolition is usually included in full renovation quotes, but asbestos testing or removal in older buildings is billed separately.

Most projects take between 2 and 4 weeks, depending on the scope of plumbing changes and tiling work involved.

We use cookies and local storage to run the site; third-party services (chat, analytics) are only activated with your consent. Privacy Policy